File #: 21-561    Version: 1
Type: Consent Agenda Status: Agenda Ready
File created: 10/6/2021 In control: City Council
On agenda: 11/9/2021 Final action:
Title: Consider authorizing the solicitation of statements of qualifications from qualified firms for Construction Manager at Risk (CMAR) services on the City Hall Renovation Project EN2004A
Attachments: 1. RFQ CMAR CH Reno EN2004A FULL FILE.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
ITEM TITLE:
Title
Consider authorizing the solicitation of statements of qualifications from qualified firms for Construction Manager at Risk (CMAR) services on the City Hall Renovation Project EN2004A
body
INITIATOR: Director of Engineering, Joseph Painter

STAFF INFORMATION SOURCE: Director of Engineering, Joseph Painter

BACKGROUND: Council approved professional services contract with MA+ Architecture, LLC to provide design services for City Hall Renovation Project EN2004A on December 8, 2020. The contract consisted of a Preliminary Report (Schematic Design) for completing the renovation of City Hall in the amount of $67,500. On July 13, 2021, MA+ Architecture presented the schematic design information at the meeting and Council approved Base Bid plus Alternate Package 1 in the amount of $6,734,087.13. Estimated Costs includes Construction costs, Architect and Engineer (A&E) fees and Furniture, Fixtures and Equipment (FF&E) costs for the project are broken down into the Base Bid plus Alternate Package 1. On September 28, 2021, Council approved Amendment No.1 to the existing contract with MA+ Architecture, LLC. The Amendment No. 1 included Design Development (DD), Construction Documents (CD), Bidding (B) and Construction Administration (CA) into the existing contract in the amount of $328,515.00.

Staff seeks authorization to solicit statements of qualifications from qualified firms for Construction Manager at Risk (CMAR) services on this project. CMAR, as authorized by O.S. Title 61, Sections 216 and 217 is a delivery method which entails a commitment by a qualified Construction Manager (CM) to deliver the project within a Guaranteed Maximum Price (GMP) based on the construction documents and specifications. The selected CMAR firm will provide professional services and assist the owner and architect during design. At owner's discretion, the CM contract may be extended to include construction phase services for the project.

Staff is recommending using the ...

Click here for full text