ITEM TITLE:
Title
Consider approving the record drawings and maintenance bond for the 8-inch sanitary sewer line located on the west side of SW Brentwood Blvd, to serve a Dollar General located at 7010 SW Lee Blvd, Lawton, OK 73505, and take appropriate action as deemed necessary.
body
INITIATOR: Christine James, Planning Director
STAFF INFORMATION SOURCE: Kameron Good, Senior Planner
BACKGROUND: Construction plans were approved by City Council on June 11, 2024 to extend approximately 243 linear feet of 8-inch sanitary sewer line to serve a Dollar General located at 7010 SW Lee Blvd. The sewer line was placed along the west side of SW Brentwood Blvd. The sewer line was connected to an existing 8” sanitary sewer line that is located on the north side of Brentwood Addition Part 3B. The maintenance bond is in the amount of $11,010.00. The consulting engineer is Michael Taylor with Cowan Group Engineering.
The City Planning Commission recommended approval of the construction plans on May 30, 2024.
Public Utilities have reviewed the record drawings and recommends approval.
The City Planning Commission recommended approval of the record drawings and maintenance bond with a 8-0 vote on November 14, 2024. The minutes are attached as an exhibit.
EXHIBIT: Record Drawings
Maintenance Bond
CPC Minutes November 14, 2024
KEY ISSUES: N/A
FUNDING SOURCE: N/A
CPC RECOMMENDED COUNCIL ACTION: Approve the record drawings and maintenance bond for an 8-inch sanitary sewer line located on the west side of SW Brentwood Blvd, to serve a Dollar General located at 7010 SW Lee Blvd. Lawton, OK 73505.