Title: Consider: (1) waiving paragraph (A)(4)(a) of City Code Section 10-1-108 for the time to accept bids and instead apply the requirements set forth in Section 111 of the Public Competitive Bidding Act of 1974, and (2) for good cause shown [to include having to hold two public input sessions and allocate additional funding from the CIP] and in accordance with Section 111, extend by mutual written agreement through May 9, 2023, the time to award the proposed Amendment No. 2 Guaranteed Maximum Price (GMP) to the contract with Construction Manager At-Risk CMS Willowbrook, Inc. for Project EN2004A City Hall Renovation Main Building Package.
Attachments: 1. Signed May 4, 2023 Statement from CMS Willowbrook (Proposed written extension agreement), 2. City Code City Code Section 10-1-108, 3. 61 O.S. ยง111
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
ITEM TITLE:
Title
Consider: (1) waiving paragraph (A)(4)(a) of City Code Section 10-1-108 for the time to accept bids and instead apply the requirements set forth in Section 111 of the Public Competitive Bidding Act of 1974, and (2) for good cause shown [to include having to hold two public input sessions and allocate additional funding from the CIP] and in accordance with Section 111, extend by mutual written agreement through May 9, 2023, the time to award the proposed Amendment No. 2 Guaranteed Maximum Price (GMP) to the contract with Construction Manager At-Risk CMS Willowbrook, Inc. for Project EN2004A City Hall Renovation Main Building Package.
body
INITIATOR: Director of Engineering, Joseph Painter, P.E.

STAFF INFORMATION SOURCE: Director of Engineering - Joseph Painter, P.E.; Timothy Wilson - Deputy City Attorney

BACKGROUND: Development of design and construction drawings by MA+ Architecture, LLC for this project was authorized by Council on September 28, 2021. Construction drawings and specifications for this project are complete. On May 10, 2022, council authorized an agreement with CMS Willowbrook, Inc. (CMS) to serve as Construction Manager At-Risk for this project. Council approved Amendment 1 to the contract with CMS on August 23, 2022, to establish the Guaranteed Maximum Price (GMP) for the Early Paving and HVAC Unit purchase portion of this project. The parking lot construction portion of this project is complete, and delivery of HVAC units is estimated for June 2023.

The Main Building portion of this project consists of renovations to approximately 35,500 SF of the existing building space. Renovation will take place on the first, second, third and fourth floors and includes demolition, framing, plumbing, electrical and room finishes. The estimated construction time required for this phase of the contract is 19 months from Notice to Proceed. On December 13, 2022, Council approved the design and authorized solicitating bids for the Main ...