Title: Consider approving construction plans for an 8-inch sanitary sewer line to serve a proposed Dollar General to be located at 7010 SW Lee Blvd, Lawton, OK 73505, subject to the conditions listed.
Attachments: 1. Construction Plan, 2. 05.30.2024 CPC Minutes
Related files: 24-1496, 24-2175
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

ITEM TITLE:

Title

Consider approving construction plans for an 8-inch sanitary sewer line to serve a proposed Dollar General to be located at 7010 SW Lee Blvd, Lawton, OK 73505, subject to the conditions listed.

body

INITIATOR:  Christine James, Planning Director

 

STAFF INFORMATION SOURCE:  Kameron Good, Senior Planner

 

BACKGROUND: Construction plans have been submitted to extend approximately 243 linear feet of 8-inch sanitary sewer line to serve a proposed Dollar General to be located at 7010 SW Lee Blvd. The sewer line will be placed along the west side of SW Brentwood Blvd. The sewer line will be connected to an existing 8” sanitary sewer line that is located on the north side of Brentwood Addition Part 3B. The consulting engineer is Michael Taylor with Cowan Group Engineering.   

Staff has reviewed the plans and recommends approval subject to the following conditions: 
1.
                     Obtain an ODEQ permit for the construction of the sewer line extension.

The City Planning Commission recommended approval on May 30, 2024.

 

EXHIBIT:  Construction Plans
CPC Minutes 5-30-2024

 

KEY ISSUES:  None

 

FUNDING SOURCE:  N/A

 

CPC RECOMMENDED COUNCIL ACTION:  Approve the construction plans for an 8-inch sanitary sewer line to serve a proposed Dollar General to be located at 7010 SW Lee Blvd. Lawton, OK 73505, subject to the conditions listed.