File #: 23-387    Version: 1
Type: Consent Agenda Status: Agenda Ready
File created: 4/25/2023 In control: City Council
On agenda: 5/9/2023 Final action:
Title: Consider and take action on entering a conditional contract with Garver, LLC, for Engineering and Design Services for a water main line extension to support the CCID 480 acers industrial site locate at SW Bishop Road and SW 112th Street to support the Industrial project Blue Braveheart (Westwin Elements) Project. The approval is conditional on the Binding commitment by Westwin Elements for the Industrial Development or as amended by City Council.
Attachments: 1. Water Line Phase 1 and 2.pdf, 2. Lawton 2023 - Garver - PU2306 Industral Water Maine line Phase 1
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

ITEM TITLE:

Title

Consider and take action on entering a conditional contract with Garver, LLC, for Engineering and Design Services for a water main line extension to support the CCID 480 acers industrial site locate at SW Bishop Road and SW 112th Street to support the Industrial project Blue Braveheart (Westwin Elements) Project. The approval is conditional on the Binding commitment by Westwin Elements for the Industrial Development or as amended by City Council.

body

INITIATOR:  Rusty Whisenhunt Director of Public Utilities

 

STAFF INFORMATION SOURCE:  Rusty Whisenhunt Director of Public Utilities

 

BACKGROUND: The City Council entered into a redevelopment agreement on February 23,2023 to support the development of the site as refinery of Cobalt and other elements. As part of the agreement , the City of Lawton is required to bring utilities to the project site to support the industry. The contract with Garver LLC is to do the design for phase 1 of the water line construction (approximately 7500 feet). Phase 1 is the construction of a water main (12” to 20”) from Lee Blvd south along 97th Street then west along Bishop Road ½ mile to the southeast corner of the Industrial site. Phase 2 (approximately 18,000 feet) will include extending the line west past 112th Street then north to Lee Blvd  then looping back east to 97th Street. Council is being asked to award a Design contract with Garver, LLC, for the designs of the water line extension for phase 1. A very short time frame will be required once the final commitment of the industry occurs. The designs of Phase I will start after Westwind Energy (Project Blue Braveheart), has signed a binding committing or as directed by City Council. The line extension will be needed at the industrial site  even if this project does not occur.

 

EXHIBIT:   Site map, Contract with Garver, LLC,

 

KEY ISSUES:  Does City Council wish to enter into a contract with the Garver, LLC. to preform Professional Engineering and Design Services for phase 1 to support the 480 acers CCID site that is planned  support the Blue Braveheart Project, Phase I.

 

FUNDING SOURCE:  Drinking Water State Revolving Fund (DWSRF) loan P40-1011303-05

 

STAFF RECOMMENDED COUNCIL ACTION:  Approve a conditional contract in the amount  of not to exceed $328,500 with Garver, LLC, for Engineering and Design Services for the Phase I design of water line extension to support the 480 acers CCID industrial site located adjacent to SW112th  and SW Bishop Road.  The approval of contact is dependent on the binding commitment of Westwin Elements for the  Blue Braveheart Project or as amended  by City Council.