File #: 25-0158    Version: 1
Type: Consent Agenda Status: Agenda Ready
File created: 2/21/2025 In control: City Council
On agenda: 3/11/2025 Final action:
Title: Consider and take action in awarding a contract in the amount of $2,324,800.00 to Howard Construction, Inc, for the construction of PU2405 Belmont Lift Station Improvements and Forcemain Project to replace the liftstation and approximately 700 ft of 6" forcemain at SW 6th and Belmont Ave.
Attachments: 1. Bid Tab - Belmont LS, 2. Contract and Bonds PU2405, 3. Recommendation of award
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

ITEM TITLE:

Title

Consider and take action in awarding a contract in the amount of $2,324,800.00 to Howard Construction, Inc, for the construction of PU2405 Belmont Lift Station Improvements and Forcemain Project to replace the liftstation and approximately 700 ft of 6” forcemain at SW 6th and Belmont Ave.

body

INITIATOR:  Rusty Whisenhunt, Public Utilities Director

 

STAFF INFORMATION SOURCE:  Rusty Whisenhunt, Public Utilities Director

 

BACKGROUND: City of Lawton entered into a Master Service Agreement with Jacobs Engineering Group, INC, on June 27th, 2023. Amendment Number 6 Exhibit B-2 shows the scope of services to include surveying, geotechnical investigation, hydraulic analysis, preliminary design, final design, preparation of construction documents, bidding assistance and construction support services for the workorder issued or as amended for Professional Engineering Services. This project scope includes a new lift station (LS) and force main located near the intersection of SW Belmont Avenue and SW 6th Street with demolition of the existing lift station. Amendment No. 6 was approved by City Council on February 27, 2024.
Jacobs Engineering completed the designs for the replacement of the lift station and force main.
The plans and specifications were approved at City Council on November 5
th, 2024. The project advertised in the local newspaper on January 8, 2025, and January 16, 2025. A non-mandatory pre-bid conference was held on Tuesday, January 14th, 2025, at 10:00 am in the Public Utilities Conference Room. A Bid Opening was publicly held at City Hall on February 11th, 2025, at 2 pm. A total of two (2) bids were received.



After reviewing the bid documents, it is recommended to award the project to Howard Construction, INC, who submitted the lowest responsive and responsible bid for the project. Jacobs Engineering Group, recommends awarding the project to Howard Construction, INC, in the amount of $2,324,800.00 for the construction of PU2405 Belmont Lift Station Improvements and Forcemain Project.

This project is imperative to uphold the standard of Safe Community for the citizens of Lawton as stated in the True North Culture Statement.

 

EXHIBIT:  Recommendation of Award, Bid Tabulation, Construction Contract, and Maps of Project Locations

 

KEY ISSUES:  Does City Council wish to award a contract in the amount of $2,324,800.00 to Howard Construction, Inc, for the construction of PU2405 Belmont Lift Station Improvements and Forcemain Project?

 

FUNDING SOURCE:  CWSRF $30mil loan ORF-24-0061-CW: $5,500,000 (current available in loan) - $2,324,800 (cost for this project) - $3,175,200 (total left for contingency and future projects)

 

STAFF RECOMMENDED COUNCIL ACTION:  Award a contract in the amount of $2,324,800.00 to Howard Construction, Inc, for the construction of PU2405 Belmont Lift Station Improvements and Forcemain Project.